• An Giang
  • Binh Duong
  • Binh Phuoc
  • Binh Thuan
  • Binh Dinh
  • Bac Lieu
  • Bac Giang
  • Bac Kan
  • Bac Ninh
  • Ben Tre
  • Cao Bang
  • Ca Mau
  • Can Tho
  • Dien Bien
  • Da Nang
  • Da Lat
  • Dak Lak
  • Dak Nong
  • Dong Nai
  • Dong Thap
  • Gia Lai
  • Ha Noi
  • Ho Chi Minh
  • Ha Giang
  • Ha Nam
  • Ha Tinh
  • Hoa Binh
  • Hung Yen
  • Hai Duong
  • Hai Phong
  • Hau Giang
  • Khanh Hoa
  • Kien Giang
  • Kon Tum
  • Lai Chau
  • Long An
  • Lao Cai
  • Lam Dong
  • Lang Son
  • Nam Dinh
  • Nghe An
  • Ninh Binh
  • Ninh Thuan
  • Phu Tho
  • Phu Yen
  • Quang Binh
  • Quang Nam
  • Quang Ngai
  • Quang Ninh
  • Quang Tri
  • Soc Trang
  • Son La
  • Thanh Hoa
  • Thai Binh
  • Thai Nguyen
  • Thua Thien Hue
  • Tien Giang
  • Tra Vinh
  • Tuyen Quang
  • Tay Ninh
  • Vinh Long
  • Vinh Phuc
  • Vung Tau
  • Yen Bai

Conditions for establishment and expansion of industrial clusters

VGP – The requirements for the establishment and expansion of industrial clusters (ICs) are clearly stipulated in the Government’s Decree No. 68/2017/ND-CP on the management and development of industrial clusters.

May 30, 2017 4:19 PM GMT+7

Accordingly, an industrial cluster can be established if it meets the following requirements:

1- The cluster is included in an already-approved industrial cluster development plan;

2- The cluster has its technical infrastructure constructed by legally registered, competent and experienced businesses and cooperatives;

3- If a district-level locality has already established industrial clusters, the average filling rate of those clusters must exceed 50% or the clusters’ total industrial land fund yet to be leased must be less than 50 hectares.

An industrial cluster wishing to be expanded must satisfy the conditions as follows:

1- The expansion must not exceed 75 hectares and the cluster’s land fund must be in line with land use plans in the district-level locality;

2- The cluster has its technical infrastructure constructed by legally registered, competent and experienced businesses and cooperatives;

3- The filling rate of the cluster must be at least 60% or the demand for leasing the cluster’s industrial land exceeds its current land area;

4- The cluster has completed and put into regular operation common technical infrastructure facilities in line with the detailed plan which has been approved.